Most Bitcoin miners approaching AI as a binary choice between preserving hashrate and redirecting their power toward a potentially more valuable workload. Bitdeer is taking a different route by expanding Bitcoin production while building GPU cloud and AI data-center capacity at the same time. This is not a conventional mining-to-AI conversion but an attempt to build several compute businesses around the same power infrastructure and operational capabilities.
Not a Pivoting but Building a Compute Stack
Bitcoin Mining Is Still Expanding
The Co-Mining Business Model Explained
Four Businesses Under One Compute Strategy
The Backlog Grew Without Adding GPUs
The Milestones That Determine Whether the Strategy Works – Premium
FBOX’s modular architecture supports phased expansion through standardized cooling, power, and IT modules, providing a consistent framework for AI infrastructure to grow from initial deployments to campus-scale developments. A consistent system architecture enables repeatable deployment and capacity growth while reducing the need for major infrastructure reconfiguration as deployments expand.
Not a Pivoting but Building a Compute Stack
For much of the Bitcoin-mining industry, the move into AI has been presented as a binary choice: continue mining or redirect power, capital and management attention toward a potentially more valuable workload. Bitdeer is following a different path. Its most recent update showed self-mining hashrate, third party-operated mining capacity and Bitcoin production all increasing while its AI-cloud backlog nearly tripled.
That combination makes Bitdeer one of the most interesting companies to study in the convergence between Bitcoin mining and AI infrastructure. It designs and manufactures ASICs, mines Bitcoin, deploys its machines at third-party sites, operates a GPU cloud and develops long-term AI colocation facilities.
The opportunity is significant, but so is the analytical challenge. Hashrate, deployed GPUs, revenue backlog, annualized recurring revenue and contracted IT capacity represent different businesses with different risks. To understand the strategy, each layer must be examined separately.
Bitcoin Mining Is Still Expanding
Bitdeer produced 1,355 BTC in September, up 3.4% from 1,310 BTC in August and 200% from 452 BTC one year earlier. Its self-mining hashrate increased from 79.9 EH/s to 82.3 EH/s during the month, compared with 35 EH/s in September 2025.
The company also reported 28.7 EH/s of “co-mining” hashrate, up from 21.6 EH/s in August. Combined, self-mining and co-mining represented approximately 111 EH/s of active mining capacity at the end of September. Production from both categories is included in Bitdeer’s reported BTC output.
Bitdeer separately reported 86.4 EH/s of total proprietary hashrate. This figure should not be added to co-mining hashrate as though it were another fully operating category. It consists of 82.3 EH/s of self-mining and 4.1 EH/s of “other proprietary hashrate,” which includes cloud-hashrate capacity, machines delivered but not yet deployed and machines temporarily offline because they are not currently economical to operate.
This distinction matters because headline hashrate does not always equal productive hashrate. Bitdeer’s 82.3 EH/s of self-mining and 28.7 EH/s of co-mining are the most relevant operating figures, while the additional 4.1 EH/s contains a mixture of capacity at different operating stages.
Although Bitdeer produced 1,355 BTC, it had a 47 BTC balance at the end of September (down from 2,029 BTC one year earlier). This suggests that the company is prioritizing capital deployment over accumulating mined Bitcoin. However, the update does not reconcile sales and transfers or disclose the profitability of the expanded mining fleet.
Not All Chips Are Equal. Your Firmware Should Know That
Braiins OS tests every single chip on the board and gives more work to the strong ones, and less to the weak ones.
The result is more hashrate from the exact same hardware, at any power target you set.
The Co-Mining Business Model Explained
Bitdeer defines co-mining as Bitcoin mining for its own account using Bitdeer-owned machines operated in third-party data centers. In at least some of its agreements, the infrastructure partner provides the energized site while Bitdeer deploys its SEALMINER hardware, and both parties share the net mining proceeds.
For example, agreements covering 30 MW across three Sphere 3D sites in Tennessee and Kentucky involve Bitdeer supplying SEALMINER A2 Pro Air machines while the parties share the resulting net mining proceeds.
This resembles what companies such as Canaan and MicroBT describe as “joint mining.” Under a Canaan agreement in Texas, Canaan supplied the ASICs while the local operator contributed the site and operating services. Bitcoin revenue was distributed after power, maintenance and operating expenses, using a negotiated revenue-sharing structure.
The co-mining structure sits between traditional hosting and self-mining:
Under conventional hosting, the machine owner normally pays a predetermined electricity or all-in hosting rate.
Under co-mining or joint mining, the hardware provider and site operator share mining revenue or net proceeds. The split depends on the machine’s efficiency and amount of operational expenses.
The division of power costs, repairs, downtime and equipment ownership depends on the individual contract.
Co-mining allows Bitdeer to expand production without using more capacity at its own data centers. It also creates a distribution channel for internally manufactured SEALMINER hardware. For the site operator, the structure converts available power into revenue without requiring the operator to fund the ASIC fleet.
The trade-off is that both parties retain exposure to Bitcoin price, difficulty, uptime and machine efficiency. A revenue-sharing agreement can outperform flat-rate hosting when mining economics are strong, but it also transfers more market risk to the infrastructure owner.
Four Businesses Under One Compute Strategy
Bitdeer now operates across four distinct layers of the compute value chain.
The first is Bitcoin mining. Bitdeer owns the ASICs, bears the mining risk and receives the Bitcoin production.
The second is ASIC development and manufacturing. Producing SEALMINER hardware gives the company more control over procurement, efficiency improvements and deployment schedules than miners purchasing their entire fleet from third-party manufacturers.
The third is AI cloud. Under this model, Bitdeer provides GPUs and sells compute capacity to customers. The company therefore bears the capital cost, utilization risk and technological-obsolescence risk associated with the hardware.
The fourth is AI colocation. At Tydal in Norway, Bitdeer has announced a 16-year AI/HPC lease representing approximately $4.7 billion of base-term contract value. This is an infrastructure model rather than the same GPU-cloud model used in Malaysia. The Tydal lease is therefore not included in Bitdeer’s reported $2.9 billion AI-cloud backlog.
These categories should not be blended into one generic compute business. Self-mining revenue depends heavily on Bitcoin and network difficulty. AI-cloud revenue depends on GPU utilization, compute pricing and hardware refresh cycles. Colocation revenue depends more on delivering infrastructure, meeting contractual service requirements and maintaining a creditworthy tenant.
Bitdeer is not executing one mining-to-AI conversion. It is building several businesses around a shared foundation of power, data-center development, hardware procurement and operations.
The Backlog Grew Without Adding GPUs
Bitdeer’s AI-cloud backlog increased from approximately $900 million to $2.9 billion in one month. However, its deployed GPU fleet remained unchanged at 4,328 units, while annualized recurring revenue stayed at approximately $86 million.
The increase came mainly from future customer commitments at the 21.7 MW A201 facility in Malaysia. More than 70% of its capacity has been contracted, representing over $1.7 billion of expected revenue across five years. The facility is scheduled to become operational in 2027.
The distinction is important: backlog represents future contracted revenue, not revenue Bitdeer is generating today. Converting it into operating revenue still depends on completing the facilities, installing the hardware and bringing customer workloads online.
The same caution applies to Bitdeer’s 333.5 MW AI-cloud pipeline. Some of this capacity has been secured from data-center providers but has not yet been contracted by end customers. A901, for example, adds 67 MW of planned capacity in Malaysia, but Bitdeer had not announced customer commitments for it. Securing infrastructure is an important first step—but it does not guarantee demand or revenue.
Bitdeer’s pipeline looks impressive on paper but secured capacity and backlog do not generate revenue until facilities are completed and customers begin using them. In the premium section we identify the milestones and metrics that will reveal whether Bitdeer is building a profitable compute platform or accumulating execution risk.